6330 Newtown Rd. Ste 400 Norfolk, VA 23502 phone: 757-461-6757 fax: 757-461-8516
Home
Company
Projects
Employees
Modular Hybrid Pier
.

Description and Features
.

Initial project consisted of research and determined practicality of a double deck concrete floating pier, to serve all classes of US Navy ships. Project evolved into concept design of a four section modular pier approximately 1300’ in length. All utilities will be on the lower deck so the upper deck remains relatively clear for ships operations. Electrically, design is presently proposing 8–3750 KVA substations with 480V secondary power to serve 8 turtlebacks. This arrangement will handle virtually any class ship and berthing arrangement. With new classes of ships to be served at 4.16 KV, 10 MVA substations with 4.16 KV circuits are presently planned. This will be modified as required when new ships requirements are determined. Potable water, CHL, oily water, and compressed air mechanical utilities will be provided.

Project Facts
.

Location: San Diego, CA

Owner: U.S. Navy

Type: New Construction

Gross Area: 1300’ in length

Floor Levels: 2

.Owners Budget: $2,068,343

 

< PreviousNext >

Other Clients
.

Home | Company | Projects | Employees


Design provided by Free Web Templates - your source for free website templates